General Information
Completion: | 2015 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Pedestrian bridge (footbridge) |
---|---|
Structure: |
Girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Los Angeles, Los Angeles County, California, USA |
---|---|
Location description: | The bridge is croses over the interior courtyard of the Hammer Museum in Los Angeles. |
Coordinates: | 34° 3' 34.11" N 118° 26' 37.90" W |
Technical Information
Dimensions
width | 3.0 - 9.0 m | |
span | 11 m | |
railing | height | 1.75 - 2.70 m |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Architecture
Engineers of Record
Consulting engineers
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- (2017): The John V. Tunney Bridge: A New Courtyard Connection for the Hammer Museum. Presented at: Footbridge 2017 Berlin - Tell A Story, 6-8.9.2017, Technische Universität Berlin (TU Berlin).
- About this
data sheet - Structure-ID
20074310 - Published on:
04/12/2017 - Last updated on:
13/12/2017