0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1938
Completion: 4 July 1941
Status: in use

Project Type

Awards and Distinctions

1941 Honorable Mention  

Location

Location: , , ,
Carries:
  • U.S. Route 1
Crosses:
  • Saint Johns River
Coordinates: 30° 19' 20" N    81° 39' 31" W
Show coordinates on a map

Technical Information

Dimensions

total length 512.1 m
main spans 3 x 111.3 m
number of spans 17
length of movable section 111.3 m

Cost

cost of construction United States dollar 750 000

Materials

approach viaducts steel
towers steel
truss steel

Chronology

1958

Bridge is named "John T. Alsop Bridge" after the five-time mayor of Jacksonville, a supporter of the project.

Participants

Design
Contractor
Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20009580
  • Published on:
    30/06/2003
  • Last updated on:
    31/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine