0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Kigongo–Busisi Bridge
Beginning of works: 7 December 2019
Completion: October 2024
Status: in use

Project Type

Location

Location: ,
Coordinates: 2° 43' 14.67" S    32° 52' 53.97" E
Show coordinates on a map

Technical Information

Dimensions

total length 3 000 m
number of spans 66
number of lanes 2 x 2
roadway / carriageway width 2 x 9.5 m
walkway width 2 x 2.5 m
deck deck width 28.45 m
approach viaduct Busisi
total length 1 240 m
span lengths 31 x 40 m
approach viaduct Kigongo
total length 1 240 m
span lengths 31 x 40 m
approach viaducts
deck number of longitudinal girders 13
piles diameter 1.5 m
number 720 m
main bridge
total length 520 m
span lengths 100 m - 2 x 160 m - 100 m
vertical navigation clearance 17 m
horizontal navigation clearance 2 x 74 m
deck deck depth 3.2 - 5.4 m
girder depth 1.8 m
piles diameter 2.5 m
number 84
pylons pylon height (above deck) 18.856 m

Quantities

approach viaducts
deck number of precast segments 806

Materials

deck prestressed concrete
piers reinforced concrete
pylons reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20090374
  • Published on:
    25/01/2025
  • Last updated on:
    26/01/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine