0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0km) at Mwanza, Tanzania near Kigongo/Busisi Ferry.

 Construction of J.P. Magufuli Extradosed Cable-Stayed Bridge (3.0km) at Mwanza, Tanzania near Kigongo/Busisi Ferry.
Author(s):
Presented at IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, published in , pp. 1004-1012
DOI: 10.2749/sanjose.2024.1004
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.55 MB

The J.P. Magufuli extradosed bridge is currently under construction. The bridge crossing Lake Victoria has an overall length of 3,000m and a deck width of 28.45m to accommodate 4 lanes of

3.5...
Read more

Bibliographic Details

Author(s): (Project Engineer and Bridge Engineer, TANROADS HQ)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024
Published in:
Page(s): 1004-1012 Total no. of pages: 9
Page(s): 1004-1012
Total no. of pages: 9
DOI: 10.2749/sanjose.2024.1004
Abstract:

The J.P. Magufuli extradosed bridge is currently under construction. The bridge crossing Lake Victoria has an overall length of 3,000m and a deck width of 28.45m to accommodate 4 lanes of

3.5m wide carriageway of vehicular traffic, the shoulder of 2.5m+2.5m for emergency parking and vehicle breakdown on each side, 2.5m+2.5m footpath for pedestrians on each side, and median of

2.45m. The structural arrangement of the main bridge is 100m+160m+160m+100m = 520m, the approach bridge PSC beam bridge L = 2480m (including 31@40=1240m on each side). The Superstructure is the extradosed bridge with RCC deck with three RCC Pylon of 18.856m height. The girder heights in the mid-span and end-span are 5.4m and 3.2m, respectively. This paper discusses the construction aspects of the J.P. Magufuli bridge along with the details of a special traveling formwork (Form-Traveller) that is used to enable the balanced cantilever construction, Pylons, PC House construction for the Pile Cap, and Deck Slab Partial Depth Panel for Deck Slab Construction.

Keywords:
pylons climbing formwork pile cap cantilever construction Form-Traveller Travelling Formwork Extra-dosed bridge Deck Slab Panel PC House