General Information
Completion: | 2017 |
---|---|
Status: | under construction |
Project Type
Structure: |
Launched steel jacket |
---|---|
Function / usage: |
Oil or gas platform |
Location
Technical Information
Dimensions
platform 1 (Processing) | ||
---|---|---|
number of supports | 8 | |
topside | width | 25 m |
length | 100 m | |
weight | 23 000 t | |
platform 2 (Drilling) | ||
number of supports | 8 | |
topside | width | 40 m |
length | 83 m | |
weight | 15 000 t | |
platform 3 (Riser) | ||
topside | width | 30 m |
length | 125 m | |
weight | 19 000 t | |
platform 4 (Living) | ||
number of supports | 4 | |
topside | width | 28 m |
length | 85 m | |
weight | 16 500 t |
Materials
topside |
steel
|
---|---|
bridges |
steel
|
Case Studies and Applied Products
RESTON®POT – Pot Bearings
mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.
[more]ROBO®CONTROL Permanent – Remote Monitoring System
Robo®Control detects the absence of machine specifications at the component and conveys these to a central computer. There the data are processed and they are made available to the clients through internet.
[more]Notes
Located in the Utsira High (about 140 kilometres west of Stavanger), the Johan Sverdrup Field Centre consists of four independent platforms connected by three steel truss bridges which have to accommodate very large movements at their supports on the platforms.
Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20071763 - Published on:
10/10/2016 - Last updated on:
15/01/2018