0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Jebel Ali Terminal 4 Causeway Bridge

General Information

Completion: 2015
Status: under construction

Project Type

Location

Location: , ,
Coordinates: 25° 1' 47.04" N    55° 4' 17.01" E
Show coordinates on a map

Technical Information

Dimensions

total length 440 m

Case Studies and Applied Products

LASTO®BLOCK – Elastomeric Bearings

LASTO®BLOCK – Elastomeric Bearings

mageba elastomeric bearings, which conform to various international standards, such as the EN1337, DIN4141, BS5400 and AASHTO, are used globally for bridges and other engineering constructions.

[more]

Participants

Contractor
Elastomeric bearings

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20068053
  • Published on:
    19/11/2015
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine