0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: July 2021
Completion: June 2022
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Bow River
Replaces: Jaipur Bridge (1968)
Coordinates: 51° 3' 16.18" N    114° 4' 11.25" W
Show coordinates on a map

Technical Information

Dimensions

number of spans 3
abutments number 2
deck number of cells 2
piers number 2 x 2

Cost

cost of construction Canadian dollar 5 600 000

Materials

piers weathering steel
deck slab reinforced concrete
abutments reinforced concrete
girders weathering steel

Participants

Owner
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20089874
  • Published on:
    06/12/2024
  • Last updated on:
    06/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine