General Information
Completion: | 1978 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Pont-de-l'Isère, Drôme (26), Auvergne-Rhône-Alpes, France Châteauneuf-sur-Isère, Drôme (26), Auvergne-Rhône-Alpes, France |
---|---|
Address: | Avenue du quarante cinquième parallèle (RN7) |
Crosses: |
|
Replaces: |
Old Isère River Bridge (1827)
|
Coordinates: | 44° 59' 53.80" N 4° 52' 27.33" E |
Technical Information
Dimensions
length | 309.18 m | |
span lengths | 50.125 m - 61.66 m - 84.21 m - 61.66 m - 50.125 m | |
number of spans | 5 | |
superstructure | girder depth | 2.30 - 4.70 m |
web thickness | 0.40 m / 0.60 m | |
thickness of bottom flange | 0.30 - 0.40 m | |
width of box | 5.00 m | |
deck slab width | 10 m |
Quantities
superstructure | concrete volume | 2 135 m² |
prestressing steel | 102 890 kg (48.2 kg/m³) | |
reinforcing steel | 304 143 kg (142.5 kg/m³) |
Cost
construction cost (without tax) | Euro 9 170 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pont d'Isère - Pont sur l'Isère. In: Bulletin annuel AFPC ( 1978- 1979), pp. 161-164.
- About this
data sheet - Structure-ID
20028080 - Published on:
15/05/2007 - Last updated on:
13/08/2023