0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

IPRC Demonstration Bridge Trail Bridge

General Information

Beginning of works: 27 July 2018
Completion: 18 September 2018
Status: in use

Project Type

Location

Location: , ,
Coordinates: 1° 58' 48.90" S    30° 6' 32.10" E
Show coordinates on a map

Technical Information

Dimensions

span 14 m

Materials

cables steel wire
deck steel
anchorages reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084662
  • Published on:
    25/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine