0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Industrial Flats Lift Bridge

General Information

Other name(s): Ox Bow Bend Lift Bridge; Cuyahoga River Bridge No. 8
Completion: March 1953
Status: in use

Project Type

Awards and Distinctions

1953 award winner  

Location

Location: , , ,
Crosses:
  • Cuyahoga River
Coordinates: 41° 29' 31.68" N    81° 41' 58.74" W
Show coordinates on a map

Technical Information

Dimensions

main span 79.25 m

Cost

cost of construction United States dollar 1 812 000

Materials

truss steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080831
  • Published on:
    28/03/2021
  • Last updated on:
    06/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine