General Information
Completion: | 1999 |
---|---|
Status: | in use |
Project Type
Structure: |
Double T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Neheim, Arnsberg, Hochsauerlandkreis, North Rhine-Westphalia, Germany |
---|---|
Crosses: |
|
Replaces: |
Im Ohl Bridge (1913)
|
Near: |
Im Ohl Footbridge (1982)
|
Coordinates: | 51° 27' 20.84" N 7° 57' 13.49" E |
Technical Information
Dimensions
total length | 85.00 m | |
span lengths | 25.00 m - 35.00 m - 25.00 m | |
number of spans | 3 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 233-234. (2004):
- About this
data sheet - Structure-ID
20021210 - Published on:
04/05/2006 - Last updated on:
05/02/2016