0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Ignatz-Bubis-Brücke
Beginning of works: 1876
Completion: 13 July 1878
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Main River
Part of:
Coordinates: 50° 6' 29" N    8° 41' 34" E
Show coordinates on a map

Technical Information

Dimensions

width 14.50 m
total length 183.75 m
span lengths 33.25 m - 38.50 m - 40.25 m - 38.50 m - 33.25 m
number of spans 5

Cost

Initial construction
cost of construction Mark 1 040 000
Reconstruction
cost of construction German Mark 5 000 000

Materials

deck reinforced concrete
arches steel

Chronology

6 June 1876

First pile is driven.

1944

Damaged in air raids.

1945

Blown up.

Participants

Design
Construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005223
  • Published on:
    20/09/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine