General Information
Completion: | June 2003 |
---|---|
Status: | unrealized project |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Composite material bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
San Diego, San Diego County, California, USA |
---|---|
Part of: | |
Coordinates: | 32° 52' 33.72" N 117° 13' 43.99" W |
Technical Information
Dimensions
total length | 137.2 m | |
span lengths | 54.9 m - 95.3 m | |
number of spans | 2 | |
deck | deck width | 18.3 m |
pylon | height | 57.9 m |
Quantities
structural steel | 84 t | |
concrete volume | 1 210 m³ |
Cost
cost of construction | United States dollar 6 600 000 |
Materials
pylon |
concrete-filled carbon/epoxy tubes
|
---|---|
deck |
concrete-filled carbon/epoxy tubes
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
Relevant Publications
- Kings Stormwater Channel and I-5/Gilman Bridges, USA. In: Structural Engineering International, v. 9, n. 4 (November 1999), pp. 250-253. (1999):
- About this
data sheet - Structure-ID
20005204 - Published on:
20/09/2002 - Last updated on:
08/06/2023