General Information
Completion: | 1982 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Stadium / Arena |
---|---|
Structure: |
Air-supported membrane structure |
Location
Location: |
Minneapolis, Hennepin County, Minnesota, USA |
---|---|
Address: | 900 S. 5th Street |
Replaced by: |
US Bank Stadium (2016)
|
Coordinates: | 44° 58' 26" N 93° 15' 29" W |
Technical Information
Dimensions
seats | 63 000 |
Cost
cost of construction | United States dollar 55 000 000 |
Chronology
3 April 1982 | Opening. |
---|---|
12 December 2010 | Heavy snow loads and winds cause the roof to strongly deflect downward causing tears in the fabric and damage to several panels and deflation of the dome. |
Participants
Design
- David Geiger (designer) (roof)
Architecture
Structural engineering
- Geiger Berger Associates (roof)
Membrane supplier
Relevant Web Sites
- About this
data sheet - Structure-ID
20013556 - Published on:
29/09/2004 - Last updated on:
18/08/2015