General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Walburg, Hessisch Lichtenau, Werra-Meißner-Kreis, Hesse, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 51° 11' 44.34" N 9° 45' 40.21" E |
Technical Information
Dimensions
total length | 280 m |
Quantities
deck | concrete volume | 6 000 m³ |
piers | concrete volume | 6 500 m³ |
Cost
cost of construction | Euro 9 054 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Structural engineering
Co-contractor
Bearings
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20007585 - Published on:
05/01/2003 - Last updated on:
05/02/2016