0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: May 2010
Completion: 17 December 2010
Status: in use

Project Type

Function / usage: Bicycle and pedestrian bridge
Material: Steel bridge
Structure: main span:
Through truss bridge

Location

Location: , , ,
Crosses:
  • Lahn River
Replaces: Hirsefeldsteg (1913)
Coordinates: 50° 48' 13" N    8° 46' 21" E
Show coordinates on a map

Technical Information

Dimensions

main span 27.60 m
total length 85 m
number of spans 5
walkway width 3.50 m

Cost

cost of construction Euro 1 600 000

Materials

girders steel
deck flooring wood
upper chord steel
lower chord steel
diagonals (truss) steel
verticals (truss) wood

Participants

Architecture
Structural engineering
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20064165
  • Published on:
    20/10/2012
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine