General Information

Other name(s): Nagoldbrücke Hirsau
Beginning of works: 2001
Completion: 2003
Duration of works: 20 months
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Nagold River
Carries:
  • Bundesstrasse B 463
Coordinates: 48° 44' 12.90" N    8° 44' 8.27" E
Show coordinates on a map

Technical Information

Dimensions

total length 61.50 m
span lengths 17.50 m - 26.00 m - 18.00 m
number of spans 3
bridge surface 830 m²
deck deck width 13.50 m

Quantities

abutments concrete volume 571 m³
reinforcing steel 41.6 t
foundations concrete volume 2 001 m³
reinforcing steel 71.3 t
piers structural steel 14.4 t
superstructure concrete volume 741 m³
reinforcing steel 177.1 t

Cost

cost of construction Euro 2 500 000

Materials

deck reinforced concrete
piers steel
foundations reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20018840
  • Published on:
    06/12/2005
  • Last updated on:
    22/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine