General Information
Other name(s): | Nagoldbrücke Hirsau |
---|---|
Beginning of works: | 2001 |
Completion: | 2003 |
Duration of works: | 20 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Double T-section girder bridge |
Material: |
Reinforced concrete bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Calw, Calw (Kreis), Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Carries: |
|
Coordinates: | 48° 44' 12.90" N 8° 44' 8.27" E |
Technical Information
Dimensions
total length | 61.50 m | |
span lengths | 17.50 m - 26.00 m - 18.00 m | |
number of spans | 3 | |
bridge surface | 830 m² | |
deck | deck width | 13.50 m |
Quantities
abutments | concrete volume | 571 m³ |
reinforcing steel | 41.6 t | |
foundations | concrete volume | 2 001 m³ |
reinforcing steel | 71.3 t | |
piers | structural steel | 14.4 t |
superstructure | concrete volume | 741 m³ |
reinforcing steel | 177.1 t |
Cost
cost of construction | Euro 2 500 000 |
Materials
deck |
reinforced concrete
|
---|---|
piers |
steel
|
foundations |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- Dietmar Maier (checking engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2004. Deutscher Bundes-Verlag, Berlin (Germany), 2004, pp. 97-107.
- About this
data sheet - Structure-ID
20018840 - Published on:
06/12/2005 - Last updated on:
22/07/2020