0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 13 July 1949
Status: in use

Project Type

Structure: Deck truss bridge
Support conditions:
Function / usage: Road bridge
Material: Steel bridge

Awards and Distinctions

1949 award winner  

Location

Location: , , ,
Address: North Main Street
Crosses:
  • Cuyahoga River
Replaces: High Level Bridge (1915)
Coordinates: 41° 7' 23.41" N    81° 30' 33.10" W
Show coordinates on a map

Technical Information

Dimensions

main span 146.3 m
span lengths 64.01 m - 146.3 m - 64.01 m
number of spans 3

Cost

cost of construction United States dollar 1 456 000

Materials

truss steel
abutments reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20080843
  • Published on:
    28/03/2021
  • Last updated on:
    28/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine