General Information
Other name(s): | North Hill Viaduct |
---|---|
Completion: | 1915 |
Status: | demolished (1949) |
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Akron, Summit County, Ohio, USA |
---|---|
Crossed: |
|
Replaced by: |
High Level Bridge (1949)
|
Coordinates: | 41° 7' 22.26" N 81° 30' 33.16" W |
Technical Information
Dimensions
total length | 305 m | |
height above valley floor or water | 57 m | |
number of arches | 5 | |
deck | roadway / carriageway width | 7.20 m |
walkway width | 2 x 1.20 m |
Cost
cost of construction | United States dollar 144 000 |
Materials
piers |
reinforced concrete
|
---|---|
arches |
reinforced concrete
|
Participants
Design
- A. F. Blaser (designer)
- R. S. Ferguson (designer)
Contractor
Resident engineering
- George L. Ehrman (resident engineer)
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20013337 - Published on:
12/09/2004 - Last updated on:
13/03/2020