General Information
Completion: | 1972 |
---|---|
Status: | in use |
Project Type
Structure: |
Covered bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Structure: |
Town lattice truss bridge |
Material: |
Timber bridge |
Location
Location: |
Henniker, Merrimack County, New Hampshire, USA |
---|---|
Coordinates: | 43° 10' 38.79" N 71° 49' 27.24" W |
Technical Information
Dimensions
width | 5.59 m | |
span | 34.90 m | |
length | 41.63 m |
Cost
cost of construction | United States dollar 80 000 |
Materials
truss |
wood
|
---|
Participants
Owner
Construction
- Milton Graton and Sons
- Arnold Milton Graton, Jr. (builder)
- Milton Graton (builder)
Relevant Web Sites
- About this
data sheet - Structure-ID
20006791 - Published on:
11/11/2002 - Last updated on:
14/02/2019