General Information
Other name(s): | Geh- und Radwegbrücke Hengsteysee |
---|---|
Beginning of works: | 1984 |
Completion: | October 1985 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Double T-section girder bridge |
Material: |
Concrete bridge |
Location
Location: |
Herdecke, Ennepe-Ruhr-Kreis, North Rhine-Westphalia, Germany |
---|---|
Along: |
|
Coordinates: | 51° 24' 44.32" N 7° 27' 20.43" E |
Technical Information
Dimensions
width | 3.00 m | |
total length | 175.00 m | |
span lengths | 10.50 m - 7 x 23.50 m | |
number of spans | 8 | |
girder depth | 0.92 m |
Materials
girders |
precast concrete
|
---|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 313-315. (2004):
- Sonderverfahren im Brückenbau. In: Hochtief Nachrichten, n. 5 ( 1985).
- About this
data sheet - Structure-ID
20021331 - Published on:
05/05/2006 - Last updated on:
05/02/2016