General Information
Beginning of works: | December 2009 |
---|---|
Completion: | 25 October 2010 |
Duration of works: | 11 months |
Status: | in use |
Project Type
Function / usage: |
Helicopter landing pad (helipad) |
---|---|
Material: |
Steel tower or mast |
Structure: |
Steel truss tower (free standing) platform: Girder grid |
Material: |
platform: Steel-reinforced concrete composite structure |
Location
Location: |
Trier, Rhineland-Palatinate, Germany |
---|---|
Coordinates: | 49° 45' 42.15" N 6° 38' 25.43" E |
Technical Information
Dimensions
height | 32 m | |
platform | diameter | 28 m |
surface | 620 m² |
Quantities
structural steel | 310 t | |
foundations | concrete volume | 1 000 m³ |
Materials
truss |
steel
|
---|---|
platform |
composite steel-reinforced concrete
|
stair / elevator cores |
reinforced concrete
|
Participants
Architecture
Structural engineering
Steel construction
Scaffolding
Software