0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Akinada Bridge No. 5
Completion: 1 August 1995
Status: in use

Project Type

Location

Location: , ,
Coordinates: 34° 11' 30.98" N    132° 50' 58" E
Show coordinates on a map

Technical Information

Dimensions

span 97.9 m
length 98.5 m
number of lanes 2
roadway / carriageway width 5.5 m
walkway width 1.5 m
abutments number 2
pylon height 45.00 m
number 1

Materials

pylon reinforced concrete
deck prestressed concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20067569
  • Published on:
    24/08/2015
  • Last updated on:
    21/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine