0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Talbrücke Heidingsfeld
Beginning of works: July 2014
Completion: December 2020
Status: under construction

Project Type

Location

Location: , ,
Carries:
  • Autobahn A3
Part of:
To replace: Heidingsfeld Viaduct (1963)
Coordinates: 49° 45' 10.01" N    9° 56' 34.22" E
Show coordinates on a map

Technical Information

Dimensions

length 635.00 m
span lengths 53 m - 80 m - 92 m - 100 m - 108 m - 120 m - 82 m
number of spans 7
bridge surface 26 353 m²
height above valley floor or water 50 m
total width 42.20 m
deck deck depth 4.60 m
deck width 21.75 m + 19.75 m
deck slab thickness 0.30 m
width of box 7.00 m
pier heads height 3.85 m
piers width 6.60 m
piers 20 + 30 thickness 2.40 m
piers 40-70 thickness 2.80 m
piles diameter 1.20 m
1.50 m

Quantities

deck structural steel 10 156 t
concrete volume 11 219 m³
reinforcing steel 3 405 t
substructure concrete volume 20 304 m³
reinforcing steel 2 013 t

Design Loads

live load LM 1
MLC 100 / MLC 50/50 (STANAG)
design code(s) DIN EN 1991-2

Materials

piers reinforced concrete (C 35/45)
deck slab reinforced concrete (C 35/45)
abutments reinforced concrete (C 35/45)
girders steel (S 355)
launching nose steel
pier heads reinforced concrete (C 40/50)

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043634
  • Published on:
    17/02/2009
  • Last updated on:
    20/04/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine