General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Rigid frame bridge with V-shaped legs |
Material: |
Steel-prestressed concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Stuttgart, Baden-Württemberg, Germany Leinfelden-Echterdingen, Esslingen (Kreis), Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 41' 52.87" N 9° 11' 14.45" E |
Technical Information
Dimensions
total length | 146.00 m | |
span lengths | 23.58 m - 26.74 m - 34.00 m - 34.68 m - 27.00 m | |
number of spans | 5 | |
bridge surface | 2 095 m² | |
deck | width | 13.25 m |
piles | diameter | 1.20 m |
Quantities
deck | structural steel | 615 t |
concrete volume | 605 m³ | |
reinforcing steel | 180 t | |
foundations | concrete volume | 500 m³ |
reinforcing steel | 76 t | |
piles | reinforcing steel | 31 t |
total length of piles | 265 m | |
substructure | concrete volume | 585 m³ |
reinforcing steel | 105 t |
Design Loads
live load |
DIN FB 101 ML 50/50 – 100 (STANAG) |
Cost
cost of construction | Euro 3 930 000 |
Materials
piers |
reinforced concrete
|
---|---|
foundations |
reinforced concrete
|
piles |
reinforced concrete
|
deck slab |
prestressed concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
pile caps |
reinforced concrete
|
Participants
Owner
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
- Jörg Münzner (checking engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2009. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-61-3, 2009, pp. 57-77.
- (Semi-Integrale Überführungsbauwerke. Erfahrungen in Konstruktion und Herstellung. In: Brückenbau, v. 1, n. 1 ( 2009), pp. 70-74. (2009):
- About this
data sheet - Structure-ID
20043657 - Published on:
18/02/2009 - Last updated on:
05/02/2016