0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Túnel de la Bahía de La Habana
Beginning of works: 6 June 1955
Completion: 31 May 1958
Duration of works: 30 months
Status: in use

Project Type

Structure: Immersed tube tunnel
Function / usage: Road tunnel
Construction method: Immersed tube method

Location

Location: , ,
Coordinates: 23° 9' 2.55" N    82° 21' 16.98" W
Coordinates: 23° 8' 39.41" N    82° 21' 24.22" W
Show coordinates on a map

Technical Information

Dimensions

total length ca. 1 600 m
tunnel length 733 m
number of lanes 2 x 2
roadway / carriageway width 2 x 2 × 3.35 m
number of tubes 2

Cost

cost of construction 28 500 000

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20013615
  • Published on:
    03/10/2004
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine