General Information
Other name(s): | Túnel de la Bahía de La Habana |
---|---|
Beginning of works: | 6 June 1955 |
Completion: | 31 May 1958 |
Duration of works: | 30 months |
Status: | in use |
Project Type
Structure: |
Immersed tube tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Immersed tube method |
Location
Location: |
Havana, La Habana, Cuba |
---|---|
Coordinates: | 23° 9' 2.55" N 82° 21' 16.98" W |
Coordinates: | 23° 8' 39.41" N 82° 21' 24.22" W |
Technical Information
Dimensions
total length | ca. 1 600 m | |
tunnel length | 733 m | |
number of lanes | 2 x 2 | |
roadway / carriageway width | 2 x 2 × 3.35 m | |
number of tubes | 2 |
Cost
cost of construction | 28 500 000 |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Immersed Tube Tunnels. A Study in Achievement. Kemp's International Publications, London (United Kingdom), pp. 43-72. :
- Le tunnel sous-marin de La Havane (Cuba). In: Travaux, n. 289 (November 1958), pp. 951. (1958):
- About this
data sheet - Structure-ID
20013615 - Published on:
03/10/2004 - Last updated on:
28/05/2021