General Information
Name in local language: | Hauenstein-Basistunnel |
---|---|
Beginning of works: | 1912 |
Completion: | 1916 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Tecknau, Basel-Country, Switzerland Trimbach, Solothurn, Switzerland |
---|---|
See also: |
Hauenstein Tunnel (1858)
|
Coordinates: | 47° 26' 29.98" N 7° 53' 24.91" E |
Coordinates: | 47° 22' 13.96" N 7° 54' 57.80" E |
Technical Information
Dimensions
tunnel length | 8 134 m |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Der Hauenstein-Basistunnel. In: Schweizerische Bauzeitung (1883-1946), v. 50, n. 5 (3 August 1907).
- Hauenstein-Basistunnel und elektrische Traktion. In: Schweizerische Bauzeitung (1883-1946), v. 54, n. 24 (11 December 1909).
- Ueber die Stabilität von Tunnelmauerwerk. unter Berücksichtigung der Erfahrung beim Bau des Hauenstein-Basistunnels. In: Schweizerische Bauzeitung (1883-1946), v. 64, n. 3 (18 July 1914). (1914):
- Vom Hauenstein-Basistunnel. In: Schweizerische Bauzeitung (1883-1946), v. 58, n. 18 (29 October 1911).
- Vom Hauenstein-Basistunnel. In: Schweizerische Bauzeitung (1883-1946), v. 58, n. 25 (16 December 1911).
- About this
data sheet - Structure-ID
20033910 - Published on:
01/01/2008 - Last updated on:
12/12/2021