0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1998
Completion: 1999
Status: in use

Project Type

Structure: Half-through arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: Hannoversche Straße
Crosses:
  • Mittellandkanal
Part of:
Replaces: Hannoversche Strasse Bridge (1914)
Coordinates: 52° 23' 12.80" N    9° 50' 6.33" E
Show coordinates on a map

Technical Information

Dimensions

span 61.39 m
deck width 19.50 m

Cost

cost of construction German Mark 8 600 000

Materials

deck steel
arches steel
abutments reinforced concrete

Chronology

June 1998

Construction begins.

December 1999

Completion.

January 2000

Opened to traffic.

Participants

Design
Architecture
Structural engineering
Checking engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008721
  • Published on:
    21/03/2003
  • Last updated on:
    20/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine