0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1992
Completion: 8 December 2015
Status: in use

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel

Location

Location: , ,
Coordinates: 56° 21' 43" N    12° 48' 20" E
Coordinates: 56° 25' 27.81" N    12° 53' 17.54" E
Show coordinates on a map

Technical Information

Dimensions

tube 1 tunnel length 8 722 m
tube 2 length 8 710 m

Cost

cost of construction ca. Euro 450 000 000

Chronology

1997

2 000 tons of Rhoca-Gil (caulking agent) used in construction pollute the groundwater around the site. Construction is halted.

2003

Construction to re-start.

2011

Expected completion.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006821
  • Published on:
    12/11/2002
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine