General Information
Name in local language: | Gustav-Heinemann-Brücke |
---|---|
Beginning of works: | 1967 |
Completion: | 1969 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Box girder bridge Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Essen, North Rhine-Westphalia, Germany |
---|---|
Address: | Bredeneyer Straße (B 224) |
Crosses: |
|
Carries: |
|
Coordinates: | 51° 23' 13.26" N 6° 59' 57.56" E |
Technical Information
Dimensions
total length | 113.40 m | |
span lengths | 66.40 m - 47.00 m | |
number of spans | 2 | |
deck | deck depth | 1.65 - 3.40 m |
deck slab thickness | 0.32 m | |
web thickness | 1.00 m |
Cost
cost of construction | German Mark 9 500 000 |
Materials
deck |
prestressed concrete
|
---|---|
pier |
reinforced concrete
|
Participants
Checking engineering
- Ramm (checking engineer)
Co-contractor
Strengthening
Consulting
- György Iványí (consultant)
- Fastabend (consultant)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 425-428. (2004):
- About this
data sheet - Structure-ID
20009800 - Published on:
04/08/2003 - Last updated on:
06/06/2023