0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 1996
Completion: September 1998
Status: in use

Project Type

Structure: Unbraced tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: Groß-Bucholzer-Kirchweg
Crosses:
  • Mittellandkanal
Part of:
Replaces: Gross-Bucholzer-Kirchweg Bridge (1913)
Coordinates: 52° 24' 19.54" N    9° 48' 2.54" E
Show coordinates on a map

Technical Information

Dimensions

width 41.45 m
span 78.25 m

Cost

cost of construction German Mark 8 400 000

Materials

deck steel
arches steel

Chronology

June 1996

Construction begins.

September 1998

Completion.

November 1998

Opened to traffic.

Participants

Client
Original design
Architecture
Structural engineering
Checking engineering
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008715
  • Published on:
    21/03/2003
  • Last updated on:
    20/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine