General Information
Project Type
Structure: |
Unbraced tied-arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
Hanover, Region Hannover, Lower Saxony, Germany |
---|---|
Address: | Groß-Bucholzer-Kirchweg |
Crosses: |
|
Part of: |
|
Replaces: |
Gross-Bucholzer-Kirchweg Bridge (1913)
|
Coordinates: | 52° 24' 19.54" N 9° 48' 2.54" E |
Technical Information
Dimensions
width | 41.45 m | |
span | 78.25 m |
Cost
cost of construction | German Mark 8 400 000 |
Materials
deck |
steel
|
---|---|
arches |
steel
|
Chronology
June 1996 | Construction begins. |
---|---|
September 1998 | Completion. |
November 1998 | Opened to traffic. |
Participants
Client
Original design
Architecture
Structural engineering
- grbv Ingenieure im Bauwesen GmbH & Co. KG (superstructure)
- Dieter Linz (structural engineer)
Checking engineering
- Rolf Kindmann (checking engineer)
Main contractor
- Johannes Dörnen Stahlbauwerk GmbH & Co. KG (superstructure)
Contractor
- Walter Bau AG (substructure)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ingenieurbauwerke der Wasserstraßen. Brücken, Schleusen, Hebewerke - Ein Fachkompendium der Ingenieurbaukunst in Deutschland. Bundesanstalt für Wasserbau, Karlsruhe (Germany), pp. 113.
- About this
data sheet - Structure-ID
20008715 - Published on:
21/03/2003 - Last updated on:
20/07/2017