General Information

Beginning of works: 1999
Completion: 2009
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Slurry-shield machine

Location

Location: , ,
, ,
Part of:
Coordinates: 52° 9' 37.19" N    4° 33' 27.23" E
Coordinates: 52° 5' 32.49" N    4° 33' 53.14" E
Show coordinates on a map

Technical Information

Dimensions

total length 8 600 m
tunnel length 7 160 m
interior diameter 13.20
TBM total length 120 m
total weight 3 520 t
excavation diameter 14.87 m
length of shield 12.40 m
weight of shield 1 800 t
total power 9 540 kW
power at cutter head 3 500 kW
total thrust 19 x 2 × 485 = 18 430 t
torque at cutter head 136 000 kNm
cutter head speed 0 - 1.4 / min.
nominal flow rate 2 500 m³/h

Quantities

reinforcing steel 42 000 t
sheet piling 43 300 m²
walls in trench 84 900 m³
prefabricated piles 33 650 m
concrete for tunnel elements 211 900 m³
total excavated volume 1 950 000 m³
submerged concrete volume 141 300 m³
reinforced concrete volume 113 900 m³

Cost

cost of construction Dutch guilder 940 000 000

Materials

tunnel structure precast reinforced concrete

Chronology

Beginning of 1999

Invitation to tender.

17 December 1999

The contract is signed.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20004213
  • Published on:
    06/07/2002
  • Last updated on:
    28/05/2021