General Information
Name in local language: | Viaduc de la Grande Chaloupe |
---|---|
Beginning of works: | 2014 |
Completion: | 8 September 2017 |
Duration of works: | 23 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Single-cell box girder bridge |
Construction method: |
Precast segmental construction |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
La Possession, Réunion La Grande-Chaloupe, Saint-Denis, Réunion |
---|---|
Part of: | |
Coordinates: | 20° 53' 43.76" S 55° 22' 34.30" E |
Technical Information
Dimensions
total length | 240 m | |
number of spans | 4 | |
girder depth | 3.45 m | |
piers | number | 3 |
Quantities
concrete volume | 15 000 m³ | |
prestressing steel | 350 t | |
reinforcing steel | 2 300 t |
Cost
cost of construction (incl. taxes) | Euro 37 589 206.12 |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
precast concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
RESTON®POT – Pot Bearings
mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.
[more]Viaducts for new Ocean Road at La Réunion
On Réunion Island in the Western Indian Ocean, the strategically important ocean road RN1 linking the commercial port to the administrative capital and the international airport has been repeatedly affected by ocean submersion and landsl ... [more]
Participants
Design
Architecture
Co-contractor
Material supplier
Pot bearings
Relevant Web Sites
- About this
data sheet - Structure-ID
20026951 - Published on:
23/02/2007 - Last updated on:
07/01/2019