0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: June 2018
Completion: 2025
Status: under construction

Project Type

Location

Location: , , ,
, ,
Crosses:
  • Detroit River
Coordinates: 42° 17' 15.17" N    83° 5' 52.84" W
Show coordinates on a map

Technical Information

Dimensions

total length 2 500 m
number of lanes 2 x 3
main bridge
main span 853 m
vertical navigation clearance 42 m
deck deck width 37.5 m
deck slab thickness 0.250 m
number of longitudinal girders 2
pylons height 220 m
stay cables length max. 450 m
strands per cable 43 - 127

Cost

cost of construction Canadian dollar 5 700 000 000

Materials

piers reinforced concrete
pylons reinforced concrete
deck slab precast reinforced concrete
pier-abutments prestressed concrete
main girders steel

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20086269
  • Published on:
    07/08/2023
  • Last updated on:
    09/07/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine