General Information
Other name(s): | Fürgangen-Mühlebach Bridge; Lamma Gorge Bridge |
---|---|
Completion: | 14 June 2015 |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Hybrid simple-suspension bridge |
Material: |
Steel bridge |
Location
Location: |
Bellwald, Valais, Switzerland Ernen, Valais, Switzerland |
---|---|
Coordinates: | 46° 24' 34.80" N 8° 9' 8.02" E |
Technical Information
Dimensions
width | 1.4 m | |
length | 280 m | |
total weight | 57 t | |
height above valley floor or water | 92 m |
Materials
cables |
steel wire
|
---|---|
deck flooring |
wood
|
Chronology
14 June 2015 | Opened |
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
- About this
data sheet - Structure-ID
20079805 - Published on:
16/08/2020 - Last updated on:
16/08/2020