General Information
Other name(s): | Tunnel Göggelsbuch |
---|---|
Completion: | 2001 |
Status: | in use |
Project Type
Function / usage: |
High-speed rail tunnel |
---|---|
Structure: |
Tunnel with double lining |
Location
Location: |
Göggelsbuch, Allersberg, Roth (Kreis), Bavaria, Germany |
---|---|
Part of: | |
Coordinates: | 49° 13' 49.17" N 11° 13' 16.78" E |
Coordinates: | 49° 12' 38.94" N 11° 13' 50.38" E |
Technical Information
There currently is no technical data available.
Participants
Owner
Structural engineering
- ILF Beratende Ingenieure
- Seidl & Partner
- Schmitt Stumpf Frühauf und Partner Ingenieurgesellschaft im Bauwesen mbH
Checking engineering
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ancrages DSI auto-forants pour stabilisation d'un tunnel – nouvelle ligne ferroviaire ICE. Tunnel de Göggelsbuch, entre Munich et Nuremberg, Allemagne. In: DSI Info, n. 11 ( 2002- 2003), pp. 12-13.
- DSI Hollow Bolt Anchors secure tunnel for ICE high speed railway. Near-surface tunnel Göggelsbuch, Göggelsbuch, Germany. In: DSI Info, n. 11 ( 2002- 2003), pp. 12-13.
- DSI-Injektionsbohranker sichern Tunnel für ICE-Hochgeschwindigkeitsstrecke. Oberflächennaher Tunnel Göggelsbuch, Göggelsbuch, Deutschland. In: DSI Info, n. 11 ( 2002- 2003), pp. 12.
- Der Tunnel Göggelsbuch – Vortrieb im Feuerletten. In: Felsbau, v. 19, n. 5 ( 2001), pp. 218. (2001):
- About this
data sheet - Structure-ID
20012857 - Published on:
09/08/2004 - Last updated on:
28/05/2021