General Information
Completion: | Summer 2018 |
---|---|
Status: | in use |
Project Type
Material: |
Timber-UHPC composite bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Structure: |
Two-hinged arch bridge Deck arch bridge |
Location
Location: |
Grindelwald, Berne, Switzerland |
---|---|
Coordinates: | 46° 37' 49.46" N 8° 4' 32" E |
Technical Information
Dimensions
width | 3 m | |
span | 25.40 m | |
length | 40 m |
Cost
cost of construction | Swiss Franc 515 000 |
Materials
arches |
glued laminated timber (glulam)
|
---|---|
deck slab |
ultra-high-performance fiber-reinforced concrete (UHPFRC)
|
Participants
Owner
Design
Structural engineering
Consulting engineers
- Eugen Brühwiler (consulting engineer) (concrete)
Contractor
Metal construction
Timber construction
Special foundations
Concrete supplier
Relevant Web Sites
Relevant Publications
- Neubau der Gletschersandbrücke. Erste Schweizer Holz-UHFB-Verbundbrücke. In: Brückenbau, v. 12, n. 3 ( 2020), pp. 6-13. (2020):
- About this
data sheet - Structure-ID
20079505 - Published on:
13/06/2020 - Last updated on:
13/06/2020