General Information
Project Type
Structure: |
Tunnel with single lining |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Drilling and blasting |
Location
Location: |
Sankt Michael in Obersteiermark, Styria, Austria |
---|---|
Part of: | |
Next to: |
Gleinalm Tunnel (1978)
|
Coordinates: | 47° 17' 40.76" N 15° 4' 40.80" E |
Coordinates: | 47° 14' 55.86" N 15° 9' 31.98" E |
Technical Information
Dimensions
length | 8 100 m | |
tunnel | ||
---|---|---|
inner shell | thickness | 0.25 m |
Quantities
gallery | ||
---|---|---|
concrete volume | 5 000 m³ | |
reinforcing steel | 600 t | |
tunnel | ||
concrete volume | 147 000 m³ |
Materials
inner shell |
un-reinforced concrete
|
---|---|
gallery |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Gleinalm Motorway Tunnel - 2nd tube logistical challenges / Gleinalmtunnel - Neubau der zweiten Röhre. In: Geomechanics and Tunnelling, v. 9, n. 5 ( 2016), pp. 428-434. (2016):
- About this
data sheet - Structure-ID
20072272 - Published on:
07/12/2016 - Last updated on:
28/02/2019