0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: April 1969
Completion: March 1970
Status: in use

Project Type

Location

Location: ,
Crosses:
  • Ghotour River
Coordinates: 38° 28' 40.74" N    44° 46' 6.84" E
Show coordinates on a map

Technical Information

Dimensions

total length 442.9 m
arch arch span 223.1 m

Materials

arch steel

Case Studies and Applied Products

RESTON®SA – Hydraulic dampers

RESTON®SA – Hydraulic dampers

Under normal circumstances, Hydraulic Shock Absorbers allow free movements of the bridge structure. Under shock impact, e.g. due to earthquakes, high braking loads or strong winds, they function temporarily as elastic damping connections.

[more]

Participants

Design
Contractor
Seismic retrofit (2014-2015)
Shock absorbers

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008025
  • Published on:
    08/02/2003
  • Last updated on:
    05/02/2016