General Information
Other name(s): | Tunnel Gernsbach |
---|---|
Beginning of works: | November 1992 |
Completion: | October 1997 |
Duration of works: | 59 months |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Gernsbach, Rastatt (Kreis), Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 46' 10.79" N 8° 20' 12.94" E |
Coordinates: | 48° 45' 24.80" N 8° 20' 29.85" E |
Technical Information
Dimensions
total length | 1 820 m | |
clear interior profile | 9.50 m x 4.50 m | |
north ramp | length | 120 m |
south ramp | length | 173 m |
tunnel | length | 1 527 m |
Quantities
bored section | ||
---|---|---|
volume of extracted material | 121 000 m³ | |
shotcrete | 5 200 m³ | |
number of anchors | 10 500 | |
tunnel structure | concrete volume | 20 000 m³ |
reinforcing steel | 1 750 t | |
water proofing | 42 500 m² | |
cut-and-cover section | ||
reinforcing steel | 1 450 t | |
volume of extracted material | 81 000 m³ | |
sheet piling | 8 000 m² | |
shotcrete | 950 m³ | |
number of anchors | 3 200 | |
trough | concrete volume | 6 600 m³ |
tunnel | concrete volume | 9 750 m³ |
Cost
cost of construction | German Mark 80 600 000 |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Client
Original design
Structural engineering
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1998. Verkehrsblatt-Verlag, Dortmund (Germany), 1998, pp. 119-134.
- About this
data sheet - Structure-ID
20001177 - Published on:
17/12/2000 - Last updated on:
05/02/2016