0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: November 1998
Completion: September 1999
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: General-Wever-Straße / Spanhagenstraße
Crosses:
  • Mittellandkanal
Part of:
Replaces: Spanhagenstrasse Bridge (1911)
Coordinates: 52° 24' 23.22" N    9° 46' 52.61" E
Show coordinates on a map

Technical Information

Dimensions

arch span 58.40 m
total width 9.10 m

Quantities

structural steel 180 t

Cost

cost of construction German Mark 4 200 000

Materials

deck steel
arches steel
abutments reinforced concrete

Chronology

June 1998

Construction begins.

September 1999

Completion.

November 1999

Opened to traffic.

Participants

Structural engineering
Checking engineering
  • Peil (checking engineer)
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008710
  • Published on:
    21/03/2003
  • Last updated on:
    20/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine