General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Dresden, Saxony, Germany Heidenau, Sächsische Schweiz-Osterzgebirge, Saxony, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 59' 18.25" N 13° 46' 29.54" E |
Technical Information
Dimensions
main span | 45.00 m | |
total length | 288.00 m | |
span lengths | 30 m - 38 m - 4 x 45 m - 40m | |
number of spans | 7 | |
height above valley floor or water | 35 m | |
deck | deck width | 30.30 m |
Cost
cost of construction | Euro 8 000 000 |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Original design
Contractor
Formwork
Inspection services
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pan-Europe corridor moves on apace. In: Bridge Update, n. 40 (December 2003), pp. 2.
- About this
data sheet - Structure-ID
20006058 - Published on:
09/10/2002 - Last updated on:
05/02/2016