General Information
Name in local language: | Friedensbrücke; Draubrücke Villach; GAV-Brücke |
---|---|
Other name(s): | Villach Bridge |
Beginning of works: | 2002 |
Completion: | 15 December 2004 |
Status: | in use |
Project Type
Structure: |
Half-through arch bridge |
---|---|
Material: |
Steel bridge Steel-concrete composite bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Road bridge lower deck: Bicycle and pedestrian bridge |
Location
Technical Information
Dimensions
rise | 17.5 m | |
length | 129.50 m | |
arch span | 110.5 m |
Materials
deck |
composite
|
---|---|
arches |
steel
|
Participants
Design
-
Structural Design Olipitz
- Michael Olipitz (designer)
Architecture
- Peter Eckerstorfer (architect)
Structural engineering
Contractor
Formwork
Relevant Web Sites
Relevant Publications
- Back and forth. In: Bridge Design & Engineering, v. 10, n. 37 (4th Quarter 2004), pp. 16.
- About this
data sheet - Structure-ID
20014857 - Published on:
27/12/2004 - Last updated on:
10/06/2022