General Information
Status: | project phase |
---|
Project Type
Function / usage: |
Pedestrian bridge (footbridge) |
---|
Location
Location: |
Washington, District of Columbia, USA |
---|---|
Crosses: |
|
Technical Information
Cost
cost of construction | United States dollar 7 900 000 |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Other side of the tracks. In: Bridge Design & Engineering, v. 13, n. 47 (2nd Quarter 2007), pp. 10.
- About this
data sheet - Structure-ID
20030147 - Published on:
14/08/2007 - Last updated on:
05/02/2016