General Information
Other name(s): | Simmebrücke Garstatt |
---|---|
Completion: | 1939 |
Status: | in use |
Project Type
Structure: |
Three-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Reinforced concrete bridge |
Location
Location: |
Garstatt, Boltigen, Berne, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 46° 35' 34.68" N 7° 22' 31.37" E |
Technical Information
Dimensions
arch span | 32 m |
Materials
superstructure |
reinforced concrete
|
---|---|
arch |
reinforced concrete
|
Participants
Design
- Robert Maillart (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Robert Maillart. Designer, Builder, Artist. Cambridge University Press, Cambridge (United Kingdom), pp. 236-237. (1997):
- Tierra sobre el agua. Visión histórica universal de los puentes. Colegio de Ingenieros de Caminos, Canales y Puertos, Madrid (Spain), pp. 354. (1999):
- About this
data sheet - Structure-ID
20002265 - Published on:
11/11/2001 - Last updated on:
27/02/2018