0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 4 March 2019
Completion: 30 May 2019
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Agatobwe river.
Coordinates: 2° 37' 16.70" S    29° 38' 56.47" E
Show coordinates on a map

Technical Information

Dimensions

span 72.3 m

Materials

cables steel wire
anchorages reinforced concrete
deck flooring eucalypt hardwood

Notes

The bridge built by Bridges to Prosperity serves around 7000 people in the communities of Gahororo.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084746
  • Published on:
    27/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine