General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
High-speed rail bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Movable Scaffolding System |
Location
Location: |
Niederfüllbach, Coburg (Kreis), Bavaria, Germany |
---|---|
Part of: |
|
Coordinates: | 50° 13' 22.57" N 11° 0' 17.98" E |
Technical Information
Dimensions
main span | 63 m | |
total length | 1 012 m | |
span lengths | 42 m - 4 x 58 m - 3 x 63 m - 3 x 53 m - 6 x 58 m - 42 m | |
number of spans | 18 | |
height above valley floor or water | 36 m | |
deck | deck depth | 5.0 m |
deck width | 14.1 m |
Materials
deck |
prestressed concrete
|
---|
Chronology
10 December 2017 | Opened to traffic along with the entire high-speed rail line from Nuremberg to Erfurt. |
---|
Participants
Owner
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20033176 - Published on:
11/11/2007 - Last updated on:
07/12/2017