General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Quadruple T-section girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Fulda, Fulda (Kreis), Hesse, Germany |
---|---|
Address: | L3378 |
Coordinates: | 50° 34' 45.18" N 9° 42' 22.37" E |
Technical Information
Dimensions
total length | 37.51 m | |
span lengths | 17.10 m - 20.41 m | |
deck width | 11.60 m | |
number of spans | 2 | |
bridge surface | 435 m² | |
roadway / carriageway width | 8.00 m | |
longitudinal slope | 2.45% | |
crossing angle | 68.282 gon | |
deck | deck depth | 1.05 m |
deck slab thickness | 0.13 m + 0.07 m | |
girders | girder depth | 0.85 m |
web thickness | 0.55 m | |
width of upper flanges | 2.85 m | |
number | 2 x 4 |
Quantities
prestressing steel | 5.5 t | |
reinforcing steel | 170 t | |
volume of earthworks | 7 700 m³ | |
foundations & abuments | concrete volume | 805 m³ |
girders | concrete volume | 110 m³ |
piers | concrete volume | 20 m³ |
Design Loads
live load | LM1 (DIN EN 1991-2) | |
military load class | MLC 50/50-100 (STANAG) |
Cost
cost of construction | Euro 2 600 000 |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
ultra-high-performance fiber-reinforced concrete (UHPFRC) |
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
(C 45/55)
|
Participants
Owner
Client
Design
Soil investigation report
Checking engineering
- Josef Hegger (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2019. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2019, pp. 49-62.
- Überführungsbauwerk der L 3378 bei Fulda-Lehnerz. Erster Einsatz von UHPC in Deutschland im Straßenbrückenbau Teil 2: Betontechnologie und Qualitätssicherung. In: Beton- und Stahlbetonbau, v. 113, n. 11 (November 2018), pp. 821-830. (2018):
- Überführungsbauwerk der L3378 bei Fulda-Lehnerz. Erster Einsatz von UHFB in Deutschland im Straßenbrückenbau, Teil 1: Projektentwicklung und Baudurchführung. In: Beton- und Stahlbetonbau, v. 113, n. 11 (November 2018), pp. 831-841. (2018):
- About this
data sheet - Structure-ID
20079134 - Published on:
28/01/2020 - Last updated on:
28/01/2020