General Information
Name in local language: | Straßenüberführung Friedberg |
---|---|
Beginning of works: | 2006 |
Completion: | 25 July 2008 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Rigid frame bridge |
Material: |
Steel-composite material bridge |
Support conditions: |
for registered users |
Construction method: |
Structurae Plus/Pro - Subscribe Now! |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Friedberg (Hessen), Wetteraukreis, Hesse, Germany |
---|---|
Coordinates: | 50° 20' 52.59" N 8° 45' 20.28" E |
Technical Information
Dimensions
span | 27 m | |
number of spans | 1 | |
abutments | height | 8.290 m |
number | 2 | |
deck | deck width | 5.00 m |
on-center distance between girders | 2.40 m | |
girder depth | 0.625 - 0.900 m | |
number of longitudinal girders | 2 | |
foundation slab | length | 7.00 m |
Quantities
glass-fiber-reinforced polymer (GFRP) | 13.5 t |
Cost
cost of construction | Euro 550 000 |
Materials
foundations |
reinforced concrete
|
---|---|
deck slab |
glass-fiber-reinforced polymer (GFRP)
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design studies
Structural engineering
Checking engineering
-
Ingenieurgruppe Bauen
- Josef Steiner (checking engineer)
Steel construction
Concrete construction
FRP manufacturer
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Architecture + Design. 1st edition, Braun Publishing AG, Salenstein (Switzerland), ISBN 978-3-03768-025-4, pp. 100-103. (2010):
- Bridges with Glass Fibre–Reinforced Polymer Decks: The Road Bridge in Friedberg, Germany. In: Structural Engineering International, v. 20, n. 4 (November 2010), pp. 400-404. (2010):
- Brücken mit Fahrbahnen aus glasfaserverstärktem Kunststoff (GFK) - Neue Straßenbrücke in Friedberg (Hessen). In: Stahlbau, v. 78, n. 7 (July 2009), pp. 462-470. (2009):
- (2016): Monitoring and Inspection of a Fiber Reinforced Polymer (FRP) Road Bridge. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 1296-1303.
- New Design Concepts for Advanced Composite Bridges – The Friedberg Bridge in Germany. Presented at: IABSE Symposium: Responding to Tomorrow's Challenges in Structural Engineering, Budapest, Hungary, 13-15 September 2006, pp. 16-23. (2006):
- About this
data sheet - Structure-ID
20021440 - Published on:
09/05/2006 - Last updated on:
05/02/2016