Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Three-span continuous girder bridge |
Construction method: |
In-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Stein, Argovia, Switzerland Bad Säckingen, Waldshut (Kreis), Baden-Württemberg, Germany |
---|---|
Crosses: |
|
Coordinates: | 47° 32' 46.21" N 7° 56' 57.46" E |
Technical Information
Dimensions
main span | 106 m | |
total length | 224 m | |
span lengths | 106 m - 85 m - 53 m | |
number of spans | 3 | |
deck | deck depth | 2.8 - 6.25 m |
deck width | 12.92 m | |
piers | height | 16 m |
Cost
cost of construction | Swiss Franc 6 100 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die neue Rheinbrücke Stein-Bad Säckingen. Planung und Bau aus der Sicht des Bauherrn. In: Schweizer Ingenieur und Architekt, v. 97, n. 38 (20 September 1979), pp. 721-722. (1979):
- Die neue Rheinbrücke Stein-Bad Säckingen. Die Projektierung der neuen Rheinbrücke. In: Schweizer Ingenieur und Architekt, v. 97, n. 38 (20 September 1979), pp. 723-725. (1979):
- Die neue Rheinbrücke Stein-Bad Säckingen. Bauausführung. In: Schweizer Ingenieur und Architekt, v. 97, n. 38 (20 September 1979), pp. 728. (1979):
- Die neue Rheinbrücke Stein-Bad Säckingen. Vorversuche zur Erreichung der geforderten Betonqualität. In: Schweizer Ingenieur und Architekt, v. 97, n. 38 (20 September 1979), pp. 728. (1979):
- About this
data sheet - Structure-ID
20011390 - Published on:
04/01/2004 - Last updated on:
30/07/2020